What are the signs an AC control board is failing?

Identify AC control board warning signs like random shutdowns, understand replacement costs ($150–$700), select exact replacements, and safely source boards from China suppliers.
Why Does PCBA Cost More Than PCB?

Understand why PCBA costs exceed PCB: component sourcing, precise assembly (SMT/THT), and rigorous testing (X-ray, functional checks) add labor, materials, and engineering expenses.
What Is a PCB Switch?

Solve faulty switches with the right PCB switch type: push-button, toggle, slide, or membrane. Learn selection criteria, design rules, and China sourcing tips for reliability.
What Is PCB Milling?

Instant PCB prototypes without outsourcing? DIY milling saves days but demands expertise. Master waste reduction, bit selection, and workflow to avoid costly errors & bottlenecks.
What Types of PCB Antennas Exist?

Fix weak PCB wireless signals: select antenna types (monopole/shark fin), calculate dimensions using wavelength formulas, optimize materials (Rogers/PTFE), and ensure mass-production resilience.
Why Is AOI Critical for SMT Assembly?

AOI is critical for SMT assembly, detecting placement/soldering defects early. Choose 2D vs 3D AOI based on component complexity. Combine with SPI/AXI & AI for full coverage & reduced false calls.
What Are the Essential Layers in a PCB and Their Functions?

Master critical PCB layers: signal routing, power/ground planes, substrates & materials to prevent overheating, signal chaos, and costly redesigns. Ensure reliability.
What’s the critical difference between PCB schematic and layout?

Master PCB schematics: structured workflows, avoid symbol-layout errors, use hierarchical design. Transform logical concepts into manufacturable boards efficiently.
How to choose the right PCB heatsink?

Master PCB heatsink selection: calculate heat output, optimize placement/layout, and choose active/passive cooling. Prevent overheating failures and boost device reliability.
What capabilities matter most when choosing custom PCB manufacturers?

Reduce PCB delays & costs: Learn how SMT slashes assembly costs 40%, DFM checks prevent 90% rework, and rapid prototypes ship in 72 hours for smarter manufacturing.